Just wanted to share progress on my dream kitchen build. I designed and built everything you see here. The top and bottom row of tile still needs to be laid and I have to drill holes for the top floating shelves. Tomorrow the new double oven comes which will be gas and is matte white in color.

on

https://ift.tt/2YwKEYv

Submitted February 01, 2021 at 12:27AM by BetaDIY https://ift.tt/3pDkhMz

Amazon ad

Leave a Reply

Your email address will not be published. Required fields are marked *